Coal Mining Project For Niger Coal Mining

    You are currently here!
  • Home
  • Blog Coal Mining Project For Niger Coal Mining

Coal Mining Project For Niger Coal Mining

June 21, 2023 nflg 0 Comments

NFLG has done the provision of a complete coal processing plant, including coal crushing machines, coal screening plant, and coal grinding plant and so on.

Coal mining Project Key Data

Location: Air Massif, Niger Client:Société Nigerienne de Charbon d’Anour-Araren (SONICHAR) Scope:Coal mining dressing plant solution design, coal crushers and coal mills provision, screening plant installation and after-sale maintenance services Date:2006

Niger Mining

Uranium dominated Niger’s mining sector, ranking it third in the world in production and fifth in reserves. Uranium mining was the country’s leading industry in 2002, and uranium was the leading export commodity, accounting for 41% of exports in 1999. A uranium boom occurred in the late 1970s, but with the reduction in world demand in the 1980s, prices fell, although the government was partly protected by contracts negotiated earlier. Cement, brick, and chemical production were other leading industries, and Niger also produced clays, bituminous coal, gold, gypsum, limestone , molybdenum (in connection with uranium ore), phosphate rock, salt, sand and gravel, stone, cassiterite tin, and tungsten (and, at times, columbite, in connection with cassiterite).

Although uranium was the only mineral to be significantly developed, Niger was rich in a number of other minerals. The country’s first gold mine, the Samira Hill open pit, was opened in 2000 by Niger’s prime minister, and intended to produce 10,000 tons per day of ore. The combined reserves of Samira Hill and the nearby Libiri deposit were 10.1 million tons (2.2 grams per ton of gold). There were some natron and sodium sulfate deposits, an estimated 650 million tons of iron ore deposits at Say, near Niamey, and 400 million tons of phosphate deposits in “W” National Park, in the Niger River Valley. There were also unexploited deposits of manganese, lithium, copper, zinc, lead, silver, cobalt, kaolin, feldspar, gypsum, limestone, marble, and clay.

Coal Mining Project Brief Introduction

Niger is rich in mineral resources, such as uranium, gold, and silver and so on. Apart from the minerals mentioned above, coal is very abandon in Niger. In the western part of Air Massif of North central Niger, there is a mine which has reserves estimated at 9.1 Mt. Coal quality is not high, but suitable for onsite power generation for use on nearby uranium mines.

As a large coal mining company in Niger, Société Nigerienne de Charbon d’Anour-Araren (SONICHAR) is focus on coal mining of the Anour opencast coal operation in Air Massif.

Coal Mining Project In Niger

NFLG has done the provision of a complete coal processing plant, including coal crushing machines, coal screening plant, and coal grinding plant and so on. Apart from coal processing equipments, we have also offered optimized coal processing solutions which are designed by our experienced engineers of coal mining.

600-800 TPH Coal crushing plant

For your coal dressing plant, we recommend you the 600-800 TPH crushing plant which is widely used in coal processing. Click the link for more details of complete crushing plants with different capacities.

In the large plant, we adopt four-stages crushing and three-stages screening process. For primary crushing, jaw crusher with PE 1200*1500 model is chosen. And for secondary and tertiary crushing, various of cone crushers are used and two units of cone crushers are specially used for tertiary crushing. Last, in the quaternary crushing, two units of VSI crushers are used. To get materials with required fineness more precisely, we have used multi-screening equipment with different layers.